OrbitalHub

The place where space exploration, science, and engineering meet

Domain is for sale. $50,000,000.00 USD. Direct any inquiries to contact@orbitalhub.com.

 

 

NASA dicit:

NASA is a step closer to returning astronauts to the Moon in the next five years following this successful “hot fire” test of flight engine No. 2062 on the A-1 Test Stand at Stennis Space Center in Mississippi. This April 4, 2019 test caps more than four years of testing for the RS-25 engines that will help power the first four missions of the Space Launch System rockets. It also concludes a 51-month test series that demonstrated RS-25 engines can perform at the higher power level needed to launch the super heavy-lift SLS rocket.

Video Credit: NASA

 

 

  • Facebook
  • Google
  • Slashdot
  • Reddit
  • Live
  • TwitThis
01-14-19

SLS

Posted by

 

 

Wikipedia dicit:

“The Space Launch System (SLS) is an American Space Shuttle-derived super heavy-lift expendable launch vehicle. It is part of NASA’s deep space exploration plans including a crewed mission to Mars. SLS follows the cancellation of the Constellation program, and is to replace the retired Space Shuttle. The NASA Authorization Act of 2010 envisions the transformation of the Constellation program’s Ares I and Ares V vehicle designs into a single launch vehicle usable for both crew and cargo, similar to the Ares IV concept. The SLS is to be the most powerful rocket ever built with a total thrust greater than that of the Saturn V, although Saturn V could carry a greater payload mass.

The SLS launch vehicle is to be upgraded over time with more powerful versions. Its initial Block 1 version is to lift a payload of 95 metric tons to low Earth orbit (LEO), which will be increased with the debut of Block 1B and the Exploration Upper Stage. Block 2 will replace the initial Shuttle-derived boosters with advanced boosters and is planned to have a LEO capability of more than 130 metric tons to meet the congressional requirement. These upgrades will allow the SLS to lift astronauts and hardware to destinations beyond LEO: on a circumlunar trajectory as part of Exploration Mission 1 & 2 with Block 1; to deliver elements of the Lunar Orbital Platform-Gateway (LOP-G) with Block 1B; and to Mars with Block 2. The SLS will launch the Orion Crew and Service Module and may support trips to the International Space Station if necessary. SLS will use the ground operations and launch facilities at NASA’s Kennedy Space Center, Florida.”

Video Credit: NASA

 

  • Facebook
  • Google
  • Slashdot
  • Reddit
  • Live
  • TwitThis
01-9-18

Exploration Mission-1

Posted by

 

 

NASA dixit:

“Exploration Mission-1 (EM-1) will be the first integrated flight of NASA’s Space Launch System and Orion spacecraft and launch from the agency’s modernized spaceport in Florida. The uncrewed mission will send Orion thousands of miles beyond the Moon and is a critical flight test for NASA’s human deep space exploration goals. EM-1 lays the foundation for the first crewed flight of SLS and Orion, as well as a regular cadence of missions thereafter near the Moon and beyond.”

Video credit: NASA Johnson

 

  • Facebook
  • Google
  • Slashdot
  • Reddit
  • Live
  • TwitThis
10-26-17

NASA Tests RS-25 Flight Engine

Posted by

 

 

NASA dixit:

“Engineers at NASA’s Stennis Space Center in Mississippi on October 19 completed a hot-fire test of RS-25 rocket engine E2063, a flight engine for NASA’s new Space Launch System (SLS) rocket. Engine E2063 is scheduled to help power SLS on its Exploration Mission-2 (EM-2), the first flight of the new rocket to carry humans.”

Video credit: NASA

 

  • Facebook
  • Google
  • Slashdot
  • Reddit
  • Live
  • TwitThis